MultiGardens Project Status

  • Preliminary Clearance/First NOC for floating the Scheme was issued by CDA vide letter No. CDA/PLW-UP(90)/2003/2297 dated 02-08-2004. CDA approved the Layout Plan of Phase-I Block A, B & C of the Scheme vide its letter No. CDA/PLW-UP(90)/MPCHS/Vol. III/3244 dated 27-09-2006 comprising an area of about 7673 Kanals.
  • CDA Board approved the Project after careful evaluation of all merits and issued Final NOC vie No.CDA/PLW-UP-HS(90)/MPCHS/Vol. III/2003/492 dated 30-01-2008 for 7672.90 Kanals.
  • CDA also approved the Layout Plan of Phase II Block D&E of the Scheme vide No. CDA/PLW-HS(90)/MPCHS/LOP/2007/146 dated 07-03-2008 for 4480.20 Kanals.
  • Formal Inauguration of work was performed on 02-04-2006 by Senator Wasim Sajjad, the then leader of the House, Senate of Pakistan.
  • Contract for development work was awarded to M/s Mohammad Ayub & Brothers Islamabad duly approved by the Society’s AGM.
  • Engineering Design was approved by CDA vide letter No. CDA/PLW-HS (90)/MPCHS/Vol.iii/2007/14 dated 14-01-2009.
  • Majority members have taken over possession in Block B and have completed houses construction of houses. Construction on Commercial Plots has also been initiated. It was encouraged development of community living.

Development Work at site is now progressing at a fast pace. Some of the main features of work include:

  1. Completion and carpeting of all Roads of A, B & C Blocks
  2. Main entry Gate for Two-Way Traffic is operational alongside G.T Road.
  3. Another Entry Gate on 140 ft. wide Road between A & B Blocks has been contracted alongside the Main G.T Road. The Main Road 140 ft. wide has been constructed and named Mian Akhter Avenue, in recognition of his services for the Society.
  4. Landscaping around Entry Points has been tastefully planned and executed.
  5. Civil works in Block A, B & C are in the final stage. Utility services are being made available on demand
  6. Earthwork on and around Bocks ‘D’ and ‘E’ is progressing steadily. Formal contract for development of this Phase has been awarded.
  7. Two Tube-wells have already been installed and made operational while a few more are under exploration.
  8. Handing over possessions of fully developed Plots in Block ‘A,B,C’.
  9. Horticulture work along Roadsides and Parks with clusters of varied sizes of plants and shrubs has already been initiated.
  10. A public Community Club over 74 kanal land is also in process. It has been designed compatible to the existing national and international clubs containing all modern in-house amenities planned in Block ‘B’.
  11. Provision of Super Stores in Blocks ‘B’ and ‘E’ has been made to ensure availability of all kinds of merchandise for the residents.

Major portion of Water Supply would be arranged from within the Scheme through installation of the tube wells, supply from neighboring water sources and rain harvesting.